The design object in the form of an information model was the bridge on the Old Nadym-Nadym section. The bridge across the Nadym River channel and approaches to it are awaiting reconstruction with a total length of 400 meters. Now, as part of the development of design and estimate documentation, a volumetric model of the object is being created, including three-dimensional drawings, assembly diagrams, a detailed description of all elements of the designed bridge (material, reinforcement). This was reported by the press service of the Department of Transport and
The information model will chile mobile number database be created for the entire life cycle of the facility; during construction, it will be filled with information about the actual work performed. At the stage of operation and subsequent scheduled repairs, it will contain information about the current state of the facility and the work performed.
Before the design began, a set of surveys was carried out: engineering and geodetic, geological, ecological and hydrological. On their basis, design solutions will be created that will ensure the reliability of the structure in a changing climate. The project will take into account not only the local climate, the presence of complex soils, but also the rapidly changing hydrological characteristics of the rivers.
"Surveys are mandatory before the start of road construction or reconstruction and help to take into account all the nuances during the work. This approach allows us to take into account the condition of the facility at all stages of its implementation - from construction and operation to reconstruction and demolition and reduce the number of errors and miscalculations, since they can be detected in advance, at the design stage," - Ilya Dashin, Deputy Director of the State Institution "Road Directorate of the Yamal-Nenets Autonomous Okrug".
Road Facilities of the Yamalo-Nenets Autonomous Okrug .
-