Backlog is a file for working with hypotheses. Before the next cycle, a creative session is held, where ideas are generated, each of which is written in the backlog according to the algorithm:
"if" condition what do we want to do ?
effect "that": what do we want to get as a result ?
rationale for "why": why will this work ?
actions: what steps should be taken to test the idea?
After which, the team members, having come to a israel telegram database common conclusion, collectively assign points to each hypothesis according to the criteria of “belief” and “complexity”:
"Faith" is the team's level of confidence that the idea will bring the planned result. From 0 to 3, where 0 means I don't believe at all, and 3 means I'm sure it will work;
"Complexity" - how many resources are needed to start implementation. From 1 to 3, where 1 is a task for one person during the day, and 3 is the work of the team for a full sprint.
The "weight" of the hypothesis is then calculated using the formula "belief divided by complexity".
Next, the hypotheses are sorted by “weight”, as a result of which the team receives a work plan for the near future.
Example of reflecting online store metrics
-
- Posts: 611
- Joined: Sat Dec 21, 2024 4:21 am